Mateescu, Elena; Marginean, Daniel; Florea, George; Alexandru, Stelian; Matea, Constantin
Fichtner Engeneering; Power & Lighting Tehnorob ;Transelectrica
Romania’s inclusion in the European transport network and implementation of Aeolian turbines in massive groups imply increases in the transport capacity of some lines, required to transport or evacuate high powers over the existing capacities. To uprate the 220 kV double circuit line Bucharest South-Fundeni, its reconductoring was considered. This paper describes the different points (technical, environmental and economic) that must be taking into account when reconductoring an existing line With a High Temperature Low Sag (HTLS).