Case study for the reconductoring of a 220 kV double circuit transmission line in Romania Sin categoría

TRABAJOSTECNICOS CIER

Mateescu, Elena; Marginean, Daniel; Florea, George; Alexandru, Stelian; Matea, Constantin

Fichtner Engeneering; Power & Lighting Tehnorob ;Transelectrica

Romania’s inclusion in the European transport network and implementation of Aeolian turbines in massive groups imply increases in the transport capacity of some lines, required to transport or evacuate high powers over the existing capacities. To uprate the 220 kV double circuit  line Bucharest South-Fundeni, its reconductoring was considered. This paper describes the different points (technical, environmental and economic) that must be taking into account when reconductoring an existing line With a High Temperature Low Sag (HTLS).​

Empresa
  • Fichtner Engeneering; Power & Lighting Tehnorob ;Transelectrica
Países
  • Rumania
Autores
  • Alexandru, Stelian
  • Florea, George
  • Marginean, Daniel
  • Matea, Constantin
  • Mateescu, Elena
Documentos/Video Contenido bloqueado 🔒